After a massive attack on the energy system of Ukraine, the team of KP “Kharkiv Thermal Networks” launched the city’s heating system for the fifth time.
The entire team of heat networks worked around the clock to stabilize and restore the operation of the city’s heat supply systems, the company reported. It was possible to quickly localize and eliminate more than 50 defects on the networks.
Currently, all boiler rooms and CHPs have switched to winter hydraulic mode, the process of venting of individual risers is ongoing according to the requests of the 1562 service.
You may be interested
Fuente: atn.ua